Since 1980, UMP has been South Africa's pioneer in urethane pipe lining technology. Our proprietary polyurethane formulations protect pipelines against abrasive slurries, corrosive chemicals, and extreme pressure delivering reliable performance across mining, industrial, and infrastructure applications.
Unlike traditional liners, UMP’s polyurethane pipe linings are monolithic and hydrolytically stable. They maintain integrity under temperature fluctuations, resist water hammer, and deliver proven performance in slurry transport, tailings transfer, mill reticulation, concentrate lines, and in-plant process piping.
First trial contract on a residue line from the float plant in a mine in Welkom
Line from rod mill to ball mill in a Palabora Mine. Extremely high wear area
Float plant residue line at the same mine in Welkom as a result of tests conducted in 1980
Cyclone underflow pipe to mill for a mine on the West Rand
Mill transfer line at a Carltonville Mine
Commissioned after monitoring initial test line for backfill range on a Welkom mine conveying float plant residue of S.G. 1,64 - inspected Sept. 1990 after 147 000 tons solids - no visible wear
Backfill, overland line as above
Backfill column line for a mine on the West Rand
Tailings line for Uranium Mine in Namibia
Coal washing plant at one of the Rand Mine Collieries
Transporting of coal slurry from underground to waste dump
Transporting of coal slurry from underground to waste dump
A launder application conveying sea sand and titanium for a mine on northern Natal coast. These pipes had as many as 8 lateral off takes on each pipe
Fly ash from Thickner Plant at Power Station to dam at the rate of 112 tonnes per hour - 24 hours per day
Backfill column line. Next phase of the project for the same mine in Welkom that used polyurethane in 1985 on backfill, indicating their satisfaction
Backfill column line for a mine in Roodepoort choosing Redline as a result of recommendation from other mining houses
Underground tailings backfill column pipeline for gold mine in Welkom as a result of 1980 test results in same mine group
Coal plant residue to Tailings Dam for colliery in Witbank area. 20 - 33 lt/s flow rate 1,149 - 1,251 S.G. Minimum velocity 0,75m/s; ambient temperature
Coal plant residue to Tailings Dam for colliery in Witbank area. 20 - 33 lt/s flow rate 1,149 - 1,251 S.G. Minimum velocity 0,75m/s; ambient temperature
Course ash-line from boiler plant for petro chemical plant in Secunda 8 bar pressure; 2m/s velocity 40% solids 4mm particle size at 50°C - alkaline
Float plant, tailings backfill pipeline for shaft in Welkom Mine. Further phase of 1985 project where Redline was initially used. Average particle size of 35 microns; 75% solids of -75 microns and rock density of 2,7 - MOH Hardness 8